Here's part of what I wrote about one of MXD's projects...
"Burkes Flat Project (Slides 13 to 17)
"This project is already at an advanced stage with planning permission granted
to mine, sort and truck ore 30km for treatment at a Dunolly CIP plant.
Recoveries in excess of 90% can be expected from mainly near surface oxide
ore. The tenements were developed to near production by previous owners.
Documents lodged with Loddon Shire indicate ore was to be presorted with
only the higher grades going to Dunolly. The company has only to pay the
required environmental bonds and mining can begin."
MXD
matrix gold limited
quality victorian gold float, page-3
Add to My Watchlist
What is My Watchlist?