JPR jupiter energy limited

interim results of logs run from 1200m to 2778

  1. 3,668 Posts.
    lightbulb Created with Sketch. 98
    12 March 2010
    Interim Results of Logs run from 1200m to 2778m
    As shareholders were advised this morning in the Weekly Update Report #10, JPR ran
    wireline logs from 1200m to 2778m during the drilling downtime period that occurred this
    week when a mud pump needed to be replaced.
    The interim results of these restricted logs have been made available and in summary they
    are as follows:
    The good oil show announced on 8 March 2010 was at 2707-2710m MD
    and correlates to the top of the Jurassic XI sandstone.
    Log analysis shows a potential oil zone (2705-2719m MD) which is a 14m
    gross (~12m net) sand and that looks porous and has elevated resistivities
    and saturations.
    Structurally J-50 Jurassic XI is higher than the neighbouring Akkar N #1
    well (1m) but lower than NZW#2 by 32 m.
    Whilst the Primary Objective of the J-50 remains at 2920mRT, these results are encouraging
    and the zone will certainly be more fully evaluated when the final log suite is run after
    reaching Target Depth.
    Any questions on this announcement can be directed to the Company on (08) 9322 8222.
    ENDS
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
3.0¢
Change
0.000(0.00%)
Mkt cap ! $38.42M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 52552 1.9¢
 

Sellers (Offers)

Price($) Vol. No.
3.5¢ 100000 1
View Market Depth
Last trade - 16.21pm 19/09/2025 (20 minute delay) ?
JPR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.