    The secondary objective Triassic A sandstone is expected to be encountered at 2852m. That is only 7m deeper than the depth reported this morning at 3.00am WST.

    The well has recently been progressing at about 18m / 24h period, if you discount last week's 48h downtime for mud pump repairs.

    So if they are drilling on a 24h basis, we should reach Trias A sandstone at about 12.20 WST, or if they are only drilling 12h dayshifts we should have reached it at about 08.00 WST.

    I expect the former rather than the latter, as the weekly report times suggest that they are drilling on the normal 24h basis
 