CNB 0.00% 38.0¢ carnaby resources limited

Ann: Excellent Metallurgical Results - Greater Duchess Project, page-25

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 34,218 Posts.
    lightbulb Created with Sketch. 1896
    'saw Caravel using US$2.37 a pound for their PFS, but that's for a lower-grade, higher tonnage deposit. I can't find other comparables in Australia.'

    A bit early to work out costs IMHO as there are many variables , ie what is the grade , what is ore body size , ie the bigger the plant the lower the cost per tonne of ore processed on an OPEX basis
    Then Really need to know the Bond milling index of this ore for a plus 90% recovery to get an idea how it would compare with another base metal project BFS using flotation , and on a tonne of ore processed then multiplied by the % of ore to get the energy used per #
    You could guess the the BMI was around 12 for this to make a rough stab, and then multiply the cost they are getting energy at ie gas or electricity at costs .
    On the flip side with these sort of recoveries it could end up going with heap leach , and make copper cathode .
    Could compare to a project like ASX listed G1A,s BFS (which I hold) just for a bit of day dreaming fun.
    The above is what I would do , if fixated by CNB but I have no professional experience .
 
watchlist Created with Sketch. Add CNB (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.