The results should depend entirely on the assaying business' timing.
Any delays after they've finished assaying increase the risk of insider trading.
AGM 29 Nov.
So I think there's a good chance of RPM-013, RPM-019, RPM-023, and RPM-026 coming out before then. Those are 4 of 8 of the RPM South holes (maybe the 4 North facing, or the 4 South facing).
The list of drill holes (screenshot in prior post) I showed - all the names start with RPM-. So I guess that is only the list of RPM North and South drills?
Cathedral is not shown which holes are pending etc? I guess they've mentioned rough timing for Cathedral.
News Due in the Near Term
• Continuous results from both RPM and Korbel as they become available from the laboratory
• New results from the ongoing drilling at Cathedral
30 Aug - "Drilling Now Commenced at Cathedral within the Korbel Valley"
4 Oct - "Cathedral drilling continuing"
Cathedral having 12 holes for 5000m is more than RPM South's 8 holes for 3000m, which seems to be split into 2 groups of assays (RPM South having 4 drills pointing up and 4 down on the map). Maybe Cathedral would get split up into 2 or 3 announcements - Dec/Jan/Feb.
So maybe the announcement schedule -
Nov - RPM South x4
Dec - RPM South x4, Cathedral x4, RPM North x5
Jan - Cathedral x4, RPM North x3
Feb - Cathedral x4, RPM North x3
Korbel infill drilling - I don't know.
You Beauty - somewhere in there with Cathedral.
- Forums
- ASX - By Stock
- NVA
- NVA Chart
NVA Chart, page-1739
-
-
- There are more pages in this discussion • 321 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NVA (ASX) to my watchlist
(20min delay)
|
|||||
Last
16.0¢ |
Change
0.005(3.23%) |
Mkt cap ! $38.96M |
Open | High | Low | Value | Volume |
15.5¢ | 16.0¢ | 15.5¢ | $40.76K | 260.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 50778 | 15.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
17.0¢ | 20036 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 50778 | 0.155 |
4 | 141834 | 0.150 |
4 | 175742 | 0.145 |
3 | 420000 | 0.140 |
2 | 27000 | 0.135 |
Price($) | Vol. | No. |
---|---|---|
0.170 | 20036 | 1 |
0.175 | 10000 | 1 |
0.180 | 37701 | 4 |
0.185 | 5555 | 2 |
0.195 | 104995 | 2 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
NVA (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online