Dude, if the design of PB3 works and it produces 0.1 mmcfd, you can add PB1 with 3.6 mmcfd and PB2 with 1.6 mmcfd to the interstate pipeline in production.
Ismay Production
----------------
PB1 @ 3.6 mmcfd
PB2 @ 1.6 mmcfd
PC3 @ 0.00000001 mmcfd
Current share price 6.1 cents.
Do the math, this is about well design of PB3 proving that a similar completion of PB1 and PB2 will keep the water out.
At 6.1 cents, hold on to your hats because if PB3 as much as sniffs commerical gas without water, share price will be 50 cents because you can change your underpants.
Add to My Watchlist
What is My Watchlist?