"i thought they would set a plug on a pill, tag and carry on."
Plugs would be run using a cementing string...ie no drilling jewelry. Plugs would be pumped and the string pulled back a bit and theyd wait on cement before running back in with the cementing string and tagging top of plug to confirm depth of same.
Cementing can be performed through a full drilling assembly but only in an emergency situation such as where you have uncontrollable losses. Pumping cement and coarse LCM through MWD tools and motors is never a good idea. Occasionally I've seen operators use a PBL sub above the BHA which allows pumping of cement and LCM into the wellbore without going through the BHA....but PBL subs from my experience have a habit of failing and costing you a trip out of the hole.
- Forums
- ASX - By Stock
- IVZ
- Ann: Additional Elevated Gas Shows in Primary Target
Ann: Additional Elevated Gas Shows in Primary Target, page-555
-
-
- There are more pages in this discussion • 174 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.8¢ |
Change
-0.001(1.45%) |
Mkt cap ! $103.1M |
Open | High | Low | Value | Volume |
6.8¢ | 6.8¢ | 6.8¢ | $2.975K | 43.75K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 236374 | 6.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.9¢ | 1011386 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 236374 | 0.067 |
3 | 167766 | 0.066 |
6 | 438935 | 0.065 |
2 | 390625 | 0.064 |
7 | 489631 | 0.063 |
Price($) | Vol. | No. |
---|---|---|
0.069 | 1011386 | 7 |
0.070 | 934604 | 8 |
0.071 | 1064037 | 10 |
0.072 | 997000 | 8 |
0.073 | 1036012 | 6 |
Last trade - 10.10am 13/09/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |