QPM 0.00% 3.3¢ queensland pacific metals limited

Ann: TECH Project Feasibility Study, page-76

  1. 1,924 Posts.
    lightbulb Created with Sketch. 618
    Numerous industry reports indicated that capex for new build projects in Australia had increased by around 40% in the space of 12-18 months. As this trend reverses and costs normalise, there is significant scope for capex to be materially lower. The figures presented in this feasibility study represent the worst possible scenario from a costs perspective. All IMO and GLTAH.
 
watchlist Created with Sketch. Add QPM (ASX) to my watchlist
(20min delay)
Last
3.3¢
Change
0.000(0.00%)
Mkt cap ! $83.18M
Open High Low Value Volume
3.3¢ 3.4¢ 3.1¢ $277.5K 8.523M

Buyers (Bids)

No. Vol. Price($)
10 8485577 3.1¢
 

Sellers (Offers)

Price($) Vol. No.
3.3¢ 90908 1
View Market Depth
Last trade - 16.10pm 27/06/2024 (20 minute delay) ?
QPM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.