Ripsaw #1 which is located 50 miles north-west of Houston in Grimes County, Texas, as of 0600 hours CST, was drilling ahead at 3,933 approximately 750 feet above the target. The well is being directionally drilled from a surface location which is to the west of the subsurface target and therefore the well track is an "S" shape. The directional drilling is proceeding as planned and the target is expected to be intersected later this evening
Not long now.. should of stuck to DayTraders forum like i usually do, dont go hating and remember "get rich or die trying"
Peache
- Forums
- ASX - By Stock
- SSN
- tuesday
tuesday, page-80
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries