CHN 0.76% 98.3¢ chalice mining limited

Ann: Julimar Flowsheet Development and Scoping Study Update, page-10

  1. 1,843 Posts.
    lightbulb Created with Sketch. 384
    I am not surprised with the delay to the SStudy given the likely increase in resource and the excellent Pd leach recoveries on the float tails. With such a low overall leach tail grade they may be looking at a >90% or >95% Pd metallurgical recovery..As their major value element, this is big news and as they mentioned, material when it comes to the value add to the SStudy.

 
watchlist Created with Sketch. Add CHN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.