Policing of possible data leaks off rigs is very strict these days.....
During a wireline job the only way you'd be able to work out exactly what is going in would be to get into the wireline cabin and get the Geologist or Engineer to then explain what is happening.....not much chance of that happening.
The formation test tool chambers are usually unloaded after the tool is laid out and when I was involved in that operation it was always in an area away from prying eyes and it was usually obvious if there were any nosy parkers watching the operation. Youd have to be standing right next to the operation to be able to see what sort of fluids the chambers were yielding.
- Forums
- ASX - By Stock
- IVZ
- Ann: Mukuyu-1 Sidetrack - Multiple Zones of Interest
Ann: Mukuyu-1 Sidetrack - Multiple Zones of Interest, page-371
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.2¢ |
Change
-0.001(1.59%) |
Mkt cap ! $94.01M |
Open | High | Low | Value | Volume |
6.3¢ | 6.5¢ | 6.1¢ | $20.71K | 333.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 81873 | 6.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.2¢ | 265215 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 81873 | 0.061 |
7 | 442118 | 0.060 |
4 | 151949 | 0.059 |
5 | 221058 | 0.058 |
2 | 333157 | 0.057 |
Price($) | Vol. | No. |
---|---|---|
0.062 | 265215 | 1 |
0.063 | 48100 | 1 |
0.065 | 92719 | 2 |
0.066 | 85000 | 2 |
0.067 | 44775 | 1 |
Last trade - 15.52pm 18/11/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |