The rig itself is typically the longest lead item I think with 12 months wait.
We have the rig.
Drill pipe is a 9 month long lead item.
We have the drill pipe planned for Baobab ready presumably, though I'm not sure if it's suitable for well appraisal.
The key question is after ditching BH is how long do we have to wait for well services?
- Forums
- ASX - By Stock
- IVZ
- Ann: Mukuyu 1 & Sidetrack Well Results, Rig Secured for 12 months
Ann: Mukuyu 1 & Sidetrack Well Results, Rig Secured for 12 months, page-374
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $94.01M |
Open | High | Low | Value | Volume |
6.2¢ | 6.3¢ | 6.2¢ | $32.70K | 526.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 396365 | 6.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.2¢ | 89931 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 386365 | 0.061 |
6 | 414118 | 0.060 |
5 | 241949 | 0.059 |
6 | 316058 | 0.058 |
2 | 333157 | 0.057 |
Price($) | Vol. | No. |
---|---|---|
0.062 | 89931 | 5 |
0.063 | 105000 | 2 |
0.064 | 231291 | 2 |
0.065 | 111248 | 2 |
0.066 | 15000 | 1 |
Last trade - 12.41pm 19/11/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |