CTP 4.17% 5.0¢ central petroleum limited

up-ramp, down-ramp: a cognitive study, page-24

  1. 95 Posts.
    Central Petroleum Limited, as Operator, advises that drilling in its Phase One Coal Seam Gas (CSG) programme is expected to resume by 16 April 2010. The drilling program was interrupted by heavy and widespread rains in central Australia.
 
watchlist Created with Sketch. Add CTP (ASX) to my watchlist
(20min delay)
Last
5.0¢
Change
0.002(4.17%)
Mkt cap ! $37.00M
Open High Low Value Volume
4.9¢ 5.1¢ 4.7¢ $44.05K 911.5K

Buyers (Bids)

No. Vol. Price($)
2 20000 5.0¢
 

Sellers (Offers)

Price($) Vol. No.
5.2¢ 164625 2
View Market Depth
Last trade - 15.01pm 21/06/2024 (20 minute delay) ?
CTP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.