MAY 4.35% 2.2¢ melbana energy limited

Ann: First Appraisal Well Update, page-42

  1. 34 Posts.
    lightbulb Created with Sketch. 3
    Thoughts on this?

    from the ANN, page 4

    "Contractors
    Alameda-2 is to be drilled by the same contractors that drilled Melbana’s first two exploration wells in Block 9. This was considered optimum, given the considerable operational experience that has been gained and the enhancements effected to the rig spread for the conditions encountered subsurface. Maintenance and re-certification work for contractors’ equipment has been completed satisfactorily."

    Does this mean the drilling rig is ready to go, or just all the other equipment the contractors use?
    Last edited by Algar: 24/01/23
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.2¢
Change
-0.001(4.35%)
Mkt cap ! $74.14M
Open High Low Value Volume
2.4¢ 2.4¢ 2.1¢ $444.7K 19.98M

Buyers (Bids)

No. Vol. Price($)
3 2048367 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.3¢ 1402823 5
View Market Depth
Last trade - 16.10pm 12/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.