POD 0.00% 3.8¢ podium minerals limited

The second coming of PODzilla, page-16

  1. 580 Posts.
    lightbulb Created with Sketch. 312
    so this was the latest as at 20/10, no updates since:

    https://hotcopper.com.au/data/attachments/4996/4996862-5171dcb2b61933d02f50b1788de4e61d.jpg

    based on this, this quarter they are undertaking more studies in the background (mining, processing, operability) - I doubt anything will be released until the formal scoping study is completed by Q3 per the above, but these will help ensure the scoping study basis is solid.

    Infill drilling planned to kick off mid Q1 per the above. As well all know infill drilling isn't cheap and with $5m cash in the kitty as at september 30 2022 I am betting a cap raise will be completed within this quarter to get funds for the infill drilling.

    Per ASX rules, scoping studies must use indicated resources (or a large portion thereof), use of inferred resources is a no-no and requires lots of disclaimers in the study (see cautionary statement used here where ~60% inferred resource went into study https://hotcopper.com.au/threads/ann-korbel-gold-project-starter-pit-scoping-study.6613220/). To get a decent chunk of indicated resource to then give the scoping study an economic life of mine and throughput, that will take many km of infill drilling. So they will need to get some funds sorted if they want to get that scoping study done by Q3..
 
watchlist Created with Sketch. Add POD (ASX) to my watchlist
(20min delay)
Last
3.8¢
Change
0.000(0.00%)
Mkt cap ! $17.28M
Open High Low Value Volume
3.8¢ 3.8¢ 3.5¢ $3.125K 82.63K

Buyers (Bids)

No. Vol. Price($)
2 146358 3.4¢
 

Sellers (Offers)

Price($) Vol. No.
3.9¢ 60000 1
View Market Depth
Last trade - 16.10pm 09/07/2024 (20 minute delay) ?
POD (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.