STX also re-iterated the Walyering costs:-
The gross cost of the production facility remains on target for approximately $14.4 million plus at
least $2.4 million in costs for the connection and metering to the APA owned Parmelia Gas Pipeline.
The overall fixed and variable operating cost of the field is estimated at approximately $0.19/GJ
based on 33 TJ/d annual average production
- Forums
- ASX - By Stock
- TPD
- L7 Discussion
L7 Discussion, page-30
Featured News
Add TPD (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online