Hi Sanar5
I don’t think you fully understand.
The “original” picture is for the original design ( circa July 2022) for a DFS with a 50ktpa plant.
Here’s the video reference to 50ktpa.
https://youtu.be/i5KU7HtwfmU?t=264
Here’s the same video with reference to the “original diagram” and to the “shed marked with an A”
https://youtu.be/i5KU7HtwfmU?t=403
The latest diagram suggest that the footprint has increased and the shed has become bigger for the same DFS target of 50ktpa.
Do you now agree with me stating my original logic?
More Plant = More CAPEX and OPEX?
DYOR
- Forums
- ASX - By Stock
- LKE
- Ann: LKE Bell Potter Unearthed Conference 070223
Ann: LKE Bell Potter Unearthed Conference 070223, page-32
-
- There are more pages in this discussion • 229 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LKE (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.9¢ |
Change
-0.001(2.50%) |
Mkt cap ! $66.74M |
Open | High | Low | Value | Volume |
4.0¢ | 4.1¢ | 3.8¢ | $180.6K | 4.599M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
40 | 3350692 | 3.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.0¢ | 1036812 | 21 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
40 | 3350692 | 0.038 |
27 | 2651156 | 0.037 |
24 | 1810530 | 0.036 |
33 | 5277186 | 0.035 |
5 | 623556 | 0.034 |
Price($) | Vol. | No. |
---|---|---|
0.040 | 1036812 | 21 |
0.041 | 941377 | 9 |
0.042 | 718188 | 9 |
0.043 | 899433 | 6 |
0.044 | 858111 | 8 |
Last trade - 12.45pm 15/07/2024 (20 minute delay) ? |
Featured News
LKE (ASX) Chart |