CLZ 50.0% 0.1¢ classic minerals ltd

Ann: Update On Construction At Kat Gap, page-24

  1. 581 Posts.
    lightbulb Created with Sketch. 186
    i seriously doubt that they are following engineers drawings for that slab. I cant see any tie down bolts for the plant. The individual modules should be elevated above the slab on concrete to allow zero contact between standing water and the steal. An engineer would tell you exactly where the tie down bolts go, and if you drill and grout the bolts in after (because you dont know where they go), that's a sign of rank amateurism.

    I can imagine in their hast to show some progress, a few months down the track, they'll leave out the bolts altogether and have various items of plant tethered by rope to the roo bars of some utes or loaders to stop it bouncing down towards Ravensthorpe.
 
watchlist Created with Sketch. Add CLZ (ASX) to my watchlist
(20min delay)
Last
0.1¢
Change
-0.001(50.0%)
Mkt cap ! $756K
Open High Low Value Volume
0.2¢ 0.2¢ 0.1¢ $9.588K 6.011M

Buyers (Bids)

No. Vol. Price($)
137 323771597 0.1¢
 

Sellers (Offers)

Price($) Vol. No.
0.2¢ 62926441 11
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
CLZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.