OMH 2.22% 44.0¢ om holdings limited

Ann: Investor Presentation, page-69

  1. 12,091 Posts.
    lightbulb Created with Sketch. 1757
    OM Sarawak has a land holding of 500 acres, barely 50% of the area is currently utilized.
    The current project is only at 66% of the original banking feasibility study from 2011.
    Only 16 furnaces have been built compared to the 24 furnaces that were planned so only 66% of the project has been built.

    Project Operating Equipment

    The Project’s key operating capital equipment is anticipated to consist of:

    • 24 sets of 25.5MVA submerged fully and semi enclosed arc furnaces and 1 set of 5MVA refining furnace with associated transformers, raw material feeding, casing/product handling and process control infrastructure,
    • 1x36m2sinter strand with a capacity of 300,000tpa of manganese sinter ore, · 1 lime kiln with a capacity of 40,000 tonnes per annum,
    • 2 rotary kilns (for raw material moisture management), · furnace de-dusting systems,
    • a comprehensive waste heat recovery system, · compressed air plant,
    • an approximately 4km long purpose built conveyor system connecting the smelter with the future Samalaju Port with a dedicated loading/discharging facility, and
    • associated other buildings and infrastructure including water treatment plant, warehouses, workshops, laboratory and office buildings.
 
watchlist Created with Sketch. Add OMH (ASX) to my watchlist
(20min delay)
Last
44.0¢
Change
-0.010(2.22%)
Mkt cap ! $337.1M
Open High Low Value Volume
44.0¢ 44.0¢ 44.0¢ $17.59K 39.99K

Buyers (Bids)

No. Vol. Price($)
2 37310 43.5¢
 

Sellers (Offers)

Price($) Vol. No.
45.0¢ 6183 1
View Market Depth
Last trade - 15.11pm 05/07/2024 (20 minute delay) ?
OMH (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.