The man you see in the videos showing everyone the well site...has probably done more wells than we have had hot dinners.
I think the team is exceptional and have a mountain of experience. I don't think anything technical has gone wrong in these pilot wells. Logistics has been an issue absolutely. Timeline dragged but technical work has been very thorough and well executed.
The bogging of the downhole, probably silting up, is common early on and a workover for the pump is easy done. Even backflushing sometimes can rid the silt. Either way, absolutely not uncommon and part of routine work for CSG wells.
Admittedly over a much longer duration as the pump efficiency drops off this happens as maintenance, but the issue to me wasnt unexpected or poor management.
- Forums
- ASX - By Stock
- EXR
- Ann: SB Energy Sign Term Sheet
Ann: SB Energy Sign Term Sheet, page-143
-
- There are more pages in this discussion • 35 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EXR (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.5¢ |
Change
-0.001(1.79%) |
Mkt cap ! $65.82M |
Open | High | Low | Value | Volume |
5.6¢ | 5.7¢ | 5.3¢ | $112.5K | 2.049M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 18001 | 5.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.5¢ | 167495 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 18001 | 0.054 |
3 | 111283 | 0.053 |
8 | 864497 | 0.052 |
12 | 460778 | 0.051 |
16 | 1244076 | 0.050 |
Price($) | Vol. | No. |
---|---|---|
0.055 | 167495 | 3 |
0.056 | 152631 | 2 |
0.057 | 102000 | 2 |
0.058 | 587867 | 3 |
0.059 | 525485 | 4 |
Last trade - 16.10pm 08/11/2024 (20 minute delay) ? |
Featured News
EXR (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online