In reference to hole 3 - it's a nice intercept but that's what you get when you drill down an orebody rather than perpendicular to it. Irrespective...
493 @ 1.17 - 163 @ 1.85 = 330 metres @ 0.8% CuEq.
A head grade of 0.8% CuEq is not going to cut it from an underground mine at the scale of operation likely for this deposit should it ever get into production.
The MRE is currently 5.5Mt. With almost all of the drilling inside the current MRE shape, how much do you realistically think could be added? Check out post 62256150.
Note how much of the hole is inside the current MRE outline. There's only about 50m outside the outline which would make an underground cut-off.
Why don't you contact Tom and put these questions to him?
- Forums
- ASX - By Stock
- CAE
- Ann: High Grade Cu Au and Ag at Mt Cannindah Holes 15 and 16
Ann: High Grade Cu Au and Ag at Mt Cannindah Holes 15 and 16, page-24
-
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CAE (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.4¢ |
Change
-0.001(2.22%) |
Mkt cap ! $25.43M |
Open | High | Low | Value | Volume |
4.5¢ | 4.5¢ | 4.4¢ | $6.345K | 141.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 134150 | 4.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.5¢ | 75190 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 134150 | 0.043 |
1 | 17000 | 0.040 |
1 | 50000 | 0.038 |
1 | 50000 | 0.036 |
1 | 128888 | 0.015 |
Price($) | Vol. | No. |
---|---|---|
0.045 | 75190 | 1 |
0.047 | 306102 | 1 |
0.050 | 105000 | 3 |
0.053 | 8000 | 1 |
0.054 | 90000 | 1 |
Last trade - 15.26pm 17/09/2024 (20 minute delay) ? |
Featured News
CAE (ASX) Chart |