AGE 0.00% 4.5¢ alligator energy limited

Ann: Scoping Study - Samphire Uranium Project, page-13

  1. 3,558 Posts.
    lightbulb Created with Sketch. 586
    The results of the additional drilling were used to establish a new Mineral Resource Estimate (MRE)
    for the Blackbush deposit in October 2022, which was further updated in March 2023. The latest
    MRE totals 18.1Mlbs at a cut-off grade of 250ppm U3O8 from 11.4Mt @ 720ppm and includes a
    significant proportion (60%) in the Indicated category. This, along with the favourable bench-scale
    test results, have been incorporated into the Scoping Study based upon the in-situ recovery mining
    (ISR) method with a 10.0 Mlbs U3O8 total Production Target at the Blackbush deposit
    , and annual
    production targeting 1Mlbs pa U3O8 with a ramp up and ramp down as shown below.

    They will do far more dilling here and the scoping study will be updated .. this is a starting point based on current resource.




 
watchlist Created with Sketch. Add AGE (ASX) to my watchlist
(20min delay)
Last
4.5¢
Change
0.000(0.00%)
Mkt cap ! $174.1M
Open High Low Value Volume
4.6¢ 4.6¢ 4.4¢ $257.6K 5.714M

Buyers (Bids)

No. Vol. Price($)
9 2500265 4.4¢
 

Sellers (Offers)

Price($) Vol. No.
4.6¢ 438070 5
View Market Depth
Last trade - 16.10pm 23/07/2024 (20 minute delay) ?
AGE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.