Classic geologist up ramping.
Resource is open at depth. Meaning we drilled just short enough there is good grade to the bottom of the hole - could be great, but secretly we're pretty sure it's not.
Resource is open along strike. Meaning we've hit good grades in all our current holes - we'll drill the holes which show the edges of the deposit once the share price rises.
- Forums
- ASX - By Stock
- OD6
- Ann: Second Phase Drilling Complete at Splinter Rock
Ann: Second Phase Drilling Complete at Splinter Rock, page-100
-
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
Add OD6 (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.147M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 40000 | 3.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.5¢ | 38623 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 40000 | 0.038 |
1 | 40528 | 0.034 |
1 | 15656 | 0.032 |
1 | 33000 | 0.030 |
1 | 34310 | 0.029 |
Price($) | Vol. | No. |
---|---|---|
0.045 | 38623 | 1 |
0.050 | 57793 | 2 |
0.054 | 118211 | 1 |
0.062 | 161290 | 1 |
0.066 | 51000 | 1 |
Last trade - 16.12pm 04/10/2024 (20 minute delay) ? |
Featured News
CC9
Chariot Corporation (ASX:CC9) refines Black Mountain strategy, launching Pilot Mine to seize U.S. lithium opportunity
OD6 (ASX) Chart |
Day chart unavailable