daytrades may 14 morning ..., page-10

  1. 9,188 Posts.
    AUJ: big oil well in Louisiana about to be drilled. Drilling to commence 14th June. One to watch:

    The Board of Augustus Minerals Limited (Augustus or the Company) is pleased to announce that it has been advised by the operator of the Silverwood prospect (the Prospect), Kindee Oil and Gas Louisiana LLC, that the spud date of the Richardson #1 well has been revised forward and is now scheduled to commence drilling operations around 14 June 2010. The Richardson # 1 well is anticipated to take 19 days to drill. Site preparations are expected to begin in the coming week, permitting is under way and a rig contract is being prepared with Crown Drilling."



    Thinking about an index long? I liked Abbott budget reply. Will abolish Super "Profits" Tax if get into office.

    Considering...
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.