Hi Brobel,
Great work! Thanks. Here's what I could source on the Lockyer Deep-1 drill time vs. depth graphic. Of course, Lockyer Deep-1 had all those BOP issues at the 13-3/8'' casing point which delayed things significantly. Barring any operational delays at Lockyer -2, the well should be preparing to drill out the 9-5/8'' casing shoe and then into the Dongara/Wagina Formations, or if things are progressing even better, drilling towards the Kingia Formation core point. Good luck all.
Kind regards OldGeo
- Forums
- ASX - By Stock
- NWE
- DRILLING UPDATE
DRILLING UPDATE, page-68
-
- There are more pages in this discussion • 112 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NWE (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online