My mistakes mates the director is saying 2 Diamond drillers by next week and 3 or 4 RC drillers before the middle of the year [June]. What that is 6 driller rigs on site that is the same as PMT aggressive programme.
We are lucky because in WA the assays are much faster than the canadian counterparts especially for the RC assays [diamond takes longer].
Watch from 1 hour 7 minutes onwards