The upper sheet is significant prize and low risk so it’s a no brainer. I don’t know where it’s stated sherritt needing the rig back in 4th qtr. I only found general statements (in that sherritt operations report @johntie posted a while back) about drilling in the second half and perhaps that’s what they’ve brought forward to now?
I’d be extremely surprised if the rig leaves after A2. If the plan changes we’d be advised before spudding of A2, surely.
- Forums
- ASX - By Stock
- MAY
- The Melbana Energy Limited $0.86/share Party
The Melbana Energy Limited $0.86/share Party, page-346
-
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $104.4M |
Open | High | Low | Value | Volume |
3.1¢ | 3.1¢ | 3.0¢ | $11.45K | 378.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
10 | 1932332 | 3.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.1¢ | 1308746 | 11 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
10 | 1932332 | 0.030 |
14 | 925439 | 0.029 |
13 | 3733045 | 0.028 |
6 | 1564740 | 0.027 |
3 | 488499 | 0.026 |
Price($) | Vol. | No. |
---|---|---|
0.031 | 1308746 | 11 |
0.032 | 400681 | 4 |
0.033 | 680954 | 6 |
0.034 | 1125000 | 3 |
0.035 | 1040266 | 2 |
Last trade - 13.32pm 07/11/2024 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |