LKE 4.88% 4.3¢ lake resources n.l.

Ann: Achievement of Major Milestone for Project Kachi, page-129

  1. sqe
    6,939 Posts.
    lightbulb Created with Sketch. 3626

    Cloudjosh.

    The first 40,000L took 3 months. The remaining 80,000L took > 3.5months. So they already had rampup baked into those figures.

    Lets take the 2nd half of the numbers. 3.5months to produce 2/3 of the product. So that means 3.5months to produce 1660kg LCE or approximately 0.47ton per month LCE.

    The capacity of plant is 40tpa = 3.3 ton per month. Assuming it is running at 90% of capacity that is 3ton per month.

    So 3 ton per month v 0.47ton per month.

    It doesn't matter how you slice it, this thing is still way off its design criteria


    Last edited by sqe: 17/04/23
 
watchlist Created with Sketch. Add LKE (ASX) to my watchlist
(20min delay)
Last
4.3¢
Change
0.002(4.88%)
Mkt cap ! $68.40M
Open High Low Value Volume
4.1¢ 4.3¢ 4.1¢ $28.29K 680.7K

Buyers (Bids)

No. Vol. Price($)
6 327090 4.1¢
 

Sellers (Offers)

Price($) Vol. No.
4.3¢ 402457 8
View Market Depth
Last trade - 10.52am 18/09/2024 (20 minute delay) ?
LKE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.