Board to fast-track development of these pits combining them with existing production (increasing Austral’s current oxide production by 110% between 2024 and 2025).
• A combination of Anthill’s existing production plus additional cut-back oxide tonnes from
Lady Colleen will increase annual production to over 35,000 to 40,000 tonnes of copper
production expected over the next 3-5 years, which will be transformational for Austral
Resources at Anthill to mine an additional 20,000 – 23,000 tonnes of Contained Copper oxide ore.
- Forums
- ASX - By Stock
- AR1
- Ann: Austral to Increase Oxide Production by up to 100%
Ann: Austral to Increase Oxide Production by up to 100%, page-19
-
- There are more pages in this discussion • 67 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AR1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
16.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $84.34M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AR1 (ASX) Chart |
Day chart unavailable