Ann: Phase 1 Scoping Study Presentation, page-12

  1. 2,555 Posts.
    lightbulb Created with Sketch. 1825
    We started drilling around mid Jan.

    the rig Knocks out about a hole/week.

    The cores get assayed in Santiago. so that is a solid 1,000km away from the site.

    We send them in batches, so assume after every 5 holes are completed. So say first 5 holes completed by 19th Feb. Average 9 Week turnaround for the assays, so should be due just about anytime now. Think that is what they also said in the conference call.

    They have been ongoing drilling up until recently which they should be moving the drill rig to Kitsune Now. They have 8 drill pads ready to go.
 