Yes this has been my experience.
"The nature of this staged and sequenced construction is likely to allow various "teams" involved in work streams to perform in parallel to overlap the construction of the stages and shorten the overall construction time for the 50kTpa plant."
9 sites, 15 gas compression trains, 2 Pipeline Compression facilities, probably my biggest project (was at all 9 sites at different stages), simultaneous but staged build- construction overlap - as areas in stage 1 are completed, they move on to those areas on stage 2/3/4/5. So there is no break in continuity, no multiple mobilization/demobilization events, no multiple ramp up/ramp down in all things project related - rather a great big S-Curve that covers the full project with baby s-curves for each train.
- Forums
- ASX - By Stock
- LKE
- Ann: Resource Connect Asia Future Facing Commodities Presentation
Ann: Resource Connect Asia Future Facing Commodities Presentation, page-183
-
-
- There are more pages in this discussion • 16 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LKE (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.2¢ |
Change
-0.001(0.96%) |
Mkt cap ! $92.06M |
Open | High | Low | Value | Volume |
5.2¢ | 5.4¢ | 5.1¢ | $143.8K | 2.742M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
16 | 854488 | 5.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.2¢ | 98994 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
16 | 896488 | 0.051 |
27 | 1240459 | 0.050 |
5 | 1002040 | 0.049 |
9 | 1377169 | 0.048 |
6 | 934276 | 0.047 |
Price($) | Vol. | No. |
---|---|---|
0.052 | 69303 | 2 |
0.053 | 117201 | 4 |
0.054 | 336307 | 6 |
0.055 | 495652 | 7 |
0.056 | 773904 | 10 |
Last trade - 13.15pm 14/11/2024 (20 minute delay) ? |
Featured News
LKE (ASX) Chart |