"But i suspect if well drilling was more straight, side track would have been easier, ie less chance for wireline logging tool to get stuck,"
Well trajectory is only a factor in causing tool/cable sticking if there is key seating going on. This wasn't the case in M1 and the sidetrack. The problems getting logging tools down and tools and cable getting stick were hole related...namely differential sticking (related to mud weight/fluid loss and high formation permeability) and time dependent mechanical hole deterioration.
- Forums
- ASX - By Stock
- IVZ
- Ann: Quarterly Report & Cashflow
Ann: Quarterly Report & Cashflow, page-41
-
-
- There are more pages in this discussion • 54 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.2¢ |
Change
0.001(1.41%) |
Mkt cap ! $109.1M |
Open | High | Low | Value | Volume |
7.0¢ | 7.2¢ | 6.9¢ | $132.2K | 1.903M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 39904 | 6.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.2¢ | 272761 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 39904 | 0.069 |
10 | 693819 | 0.068 |
4 | 297984 | 0.067 |
4 | 275151 | 0.066 |
10 | 1008869 | 0.065 |
Price($) | Vol. | No. |
---|---|---|
0.072 | 272761 | 2 |
0.073 | 672501 | 5 |
0.074 | 1134171 | 6 |
0.075 | 1258979 | 3 |
0.076 | 1067581 | 3 |
Last trade - 16.10pm 18/10/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |