And a little more on the wider plan.
Phase 1 - DMS concentrator at Seymour
Phase 2 - Adding a grinding and flotation circuit at Seymour to add extra volume for Hydroxide
Phase 2a (or3?) - Hydroxide at Thunder Bay
Within the 22 Dec 2022 update, there was a 72.6% recovery rate but 20.9% of the lithium units had a zero recovery rate as fines/middlings. There doesn't seem to be any inherent reason why these won't recover to at least 70% when put through a flotation circuit. If that were to be possible the recovery rate as a feed source for Hydroxide would increase by 14.6% to a market leading 87%. Even with probable real-world implementation reductions in this rate, the integrated study could well be coming out with something well into the 80%'s as a recovery rate which will assist getting to the volumes needed for a 25 to 30kt plant.
It would be nice if GT1 could give an update on their recovery rate estimates around fines and middlings as it would be a surprise if they haven't done that test work yet and have a much more accurate figure than my 70% guess above (and I'm actually hoping its nearer 80% flotation recovery).
- Forums
- ASX - By Stock
- GT1
- GT1 - Megathread
GT1 - Megathread, page-690
-
-
- There are more pages in this discussion • 781 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GT1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.0¢ |
Change
-0.001(1.10%) |
Mkt cap ! $34.98M |
Open | High | Low | Value | Volume |
9.1¢ | 9.2¢ | 8.9¢ | $17.29K | 191.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 49174 | 8.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.3¢ | 15649 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 49174 | 0.089 |
2 | 15812 | 0.086 |
2 | 41000 | 0.085 |
1 | 11800 | 0.084 |
1 | 474 | 0.081 |
Price($) | Vol. | No. |
---|---|---|
0.093 | 15649 | 1 |
0.100 | 203478 | 2 |
0.105 | 179332 | 2 |
0.110 | 95000 | 1 |
0.115 | 85526 | 1 |
Last trade - 15.41pm 18/10/2024 (20 minute delay) ? |
Featured News
GT1 (ASX) Chart |