MTM 2.00% 5.1¢ mtm critical metals limited

Ann: Drilling Confirms REE Mineralisation at E Laverton, page-147

  1. 4 Posts.
    lightbulb Created with Sketch. 5
    Pr +Nd oxide cost ~48k/ton. That's just Pr+Nd not including all the other REE's
    Grade of East Laverton deposit, low ball at 1,000ppm TREO, thickness ~10metres, density say 1.8, percent of Pr+Nd 19.5% Size of deposit 12km2.
    So for every 1km2 the tons would be 1000m(length) X 1000m (Width)x 10m (thickness)x 1.8 (density) = 18Mt.
    18Mt x 1000ppm (0.1%)TREO x 19.5% Pr+Nd = 35,100 ton contained Pr+Nd per km2.
    35,000 x $48,000/ton = USD1,684,800,000. 1.6 billion/km2, contained value of Pr+Nd.
 
watchlist Created with Sketch. Add MTM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.