SUM 5.45% 26.0¢ summit minerals limited

Ann: Phase 2 drilling commences at Stallion REE Project, page-10

  1. 3,882 Posts.
    lightbulb Created with Sketch. 843
    As Jono said in the latest presentation on YouTube(I shared the link in the other thread) he said the leach results will be back within 2 weeks.

    All things pointing to a positive rerate. Happy to be here.
 
watchlist Created with Sketch. Add SUM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.