my guess is drill and blast so will need dozer, something like CAT D9, probably 2 excavators, front end loader x 2. Feed into crusher, might need 2 jaw crushers subject to rocks sizes coming from pit then the smaller broken down rock is feed into ore sorter to obtain something similar too a 20mm road base material, which would then be hauled to stockpile. I would think at least 8 or 9 in team required per shift. Could easily double shift 8 to 10 hrs per shift due to long daylight hours that time of year. Plenty goes wrong with machines so plenty of maintenance required. I recokon the best one could hope for is 16 hrs per day between 100 & 200t per hour but like Jez mentions depends on size of crushers, hardness of rock etc
- Forums
- ASX - By Stock
- AW1
- Ann: Assays Confirm Thick Intervals of Copper at Storm
Ann: Assays Confirm Thick Intervals of Copper at Storm, page-31
-
- There are more pages in this discussion • 21 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AW1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.0¢ |
Change
-0.002(2.17%) |
Mkt cap ! $53.55M |
Open | High | Low | Value | Volume |
9.1¢ | 9.3¢ | 9.0¢ | $243.5K | 2.678M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
17 | 1361445 | 9.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.1¢ | 55000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
15 | 1221445 | 0.090 |
2 | 30223 | 0.089 |
2 | 39793 | 0.088 |
2 | 54480 | 0.087 |
1 | 200000 | 0.086 |
Price($) | Vol. | No. |
---|---|---|
0.091 | 55000 | 1 |
0.092 | 350000 | 2 |
0.093 | 100000 | 1 |
0.094 | 200000 | 1 |
0.095 | 200000 | 1 |
Last trade - 16.10pm 18/10/2024 (20 minute delay) ? |
Featured News
AW1 (ASX) Chart |
The Watchlist
LGP
LITTLE GREEN PHARMA LTD
Paul Long, Chief Executive Officer
Paul Long
Chief Executive Officer
SPONSORED BY The Market Online