MXR 0.00% 3.0¢ maximus resources limited

Ann: Drill Programme commences at Wattle Dam Gold Mine, page-8

  1. 1,088 Posts.
    lightbulb Created with Sketch. 145
    the fact that there are lower grade hits down plunge of the mined shoot means that the shoot wasnt offset by a fault. The decline was west of the shear zone.

    the problem with that longsection is that they are only showing where gold is. Would be more transparent to show all pierce points on the structure, mineralised and not.
 
watchlist Created with Sketch. Add MXR (ASX) to my watchlist
(20min delay)
Last
3.0¢
Change
0.000(0.00%)
Mkt cap ! $12.83M
Open High Low Value Volume
2.9¢ 3.1¢ 2.9¢ $27.76K 923.6K

Buyers (Bids)

No. Vol. Price($)
1 250496 3.0¢
 

Sellers (Offers)

Price($) Vol. No.
3.1¢ 385887 2
View Market Depth
Last trade - 15.59pm 05/09/2024 (20 minute delay) ?
MXR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.