CHM 0.00% 2.1¢ chimeric therapeutics limited

Ann: Share purchase plan (SPP) - closing date extended, page-2

  1. 12,387 Posts.
    lightbulb Created with Sketch. 3784
    As expected, extension. True, the documents arrived late but even when on time they had to extend it.

    RAD and IMU still went backwards despite great anns and CEO interviews. Will decide in 2 weeks, depending on how low IMU falls to rather catch cheap shares over there.

    Timing atm neither on CHM nor IMU side. Not sure if 2H will be better.

    GLTA


 
watchlist Created with Sketch. Add CHM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.