stages:
Stage 1 consists of:
1. Construction of gasification wells to provide energy (syngas) for the project; and
2. 5 MW gas fired power generation.
Stage 2 consists of:
1.Expansion of gasification fields;
2.100MW gas fired power generation;
3.Ammonia facility;
4.Urea facility; and
5.Logistics, loading and transport.
- Forums
- ASX - By Stock
- NRZ
- General Discussion
General Discussion, page-342
-
- There are more pages in this discussion • 410 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NRZ (ASX) to my watchlist
|
|||||
Last
1.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $24.73M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
NRZ (ASX) Chart |
Day chart unavailable