"The project will commence with the funding of the special purpose vehicle (SPV), Victoria
Coldry Pty Ltd, which was established earlier this year and will enable the detailed, sitespecific
design and feasibility study to be undertaken by our engineers, Arup. This in turn
is expected to result in the tendering, procurement and construction of Stage 1 of the
flagship Coldry plant at Loy Yang power station by late 2013 at an estimated cost of
around US$400M (to be confirmed during detailed design)."
I don't really understand this part. Does anyone know where this 400 million is going to come from?
- Forums
- ASX - By Stock
- ECT
- geez guys this is massive
geez guys this is massive, page-54
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ECT (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $6.343M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.2¢ | $10.34K | 5.173M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 3081503 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 14303561 | 22 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 3081503 | 0.002 |
29 | 41456532 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 14303561 | 22 |
0.004 | 8358928 | 14 |
0.005 | 3296859 | 21 |
0.006 | 3178567 | 7 |
0.007 | 918333 | 2 |
Last trade - 15.24pm 07/11/2024 (20 minute delay) ? |
Featured News
ECT (ASX) Chart |