Some people are stupid. They look at the MIN and Beach results and think the entire Perth Basin thesis has taken a hit.
Little do they know that Strike has already successfully tested and flowed South Errugulla.
Thank God SN and Co know where to stick the drill bit. It turns out it's not as easy as many had assumed (i.e based on Strike's stellar results).
- Forums
- ASX - By Stock
- STX
- Trigg 1 results
Trigg 1 results, page-22
-
-
- There are more pages in this discussion • 21 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STX (ASX) to my watchlist
(20min delay)
|
|||||
Last
17.8¢ |
Change
-0.008(4.05%) |
Mkt cap ! $515.7M |
Open | High | Low | Value | Volume |
18.0¢ | 18.0¢ | 17.5¢ | $736.3K | 4.115M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
78 | 3182427 | 17.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
18.0¢ | 1299521 | 51 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
76 | 3182066 | 0.175 |
41 | 2353673 | 0.170 |
41 | 4573252 | 0.165 |
43 | 1681454 | 0.160 |
19 | 1092043 | 0.155 |
Price($) | Vol. | No. |
---|---|---|
0.180 | 1261292 | 47 |
0.185 | 1353698 | 17 |
0.190 | 1221170 | 16 |
0.195 | 1133155 | 7 |
0.200 | 966358 | 17 |
Last trade - 14.07pm 09/09/2024 (20 minute delay) ? |
Featured News
STX (ASX) Chart |