Trying to envisage what the problems that they are encountering could be......
Mining "Low strip ratio, low slimes, conventional mining,
free-flowing sand, coarse grain"...... so no rocks or organics blocking up the rougher spiral distibutors.
A brand new engineer designed (what could go wrong there?) wcp.
Operates at name plate throughput...some of the time
Maybe water issues?
Gotta pump 3000tph of ore from the pit to the wcp and pump 2970tph of tails back at 25%(?) density
Then reclaim as much water as possible from the tails void.
Water loss calcs in the dfs underestimated? bores not keeping up?
kcf
- Forums
- ASX - By Stock
- STA
- Ann: Sixth Shipment of HMC Completed at Coburn Project
Ann: Sixth Shipment of HMC Completed at Coburn Project, page-47
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STA (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $138.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
STA (ASX) Chart |
Day chart unavailable
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online