Pressure plate needs to be repaired/replaced no later than two weeks, otherwise serious potential downside risk. Agree with poster who said there should have been replacement parts available onsite, and doesn't show very high level of management of machinery maintenance.
- Forums
- ASX - By Stock
- PAN
- Ann: Savannah Nickel Project - Operational Update
Ann: Savannah Nickel Project - Operational Update, page-54
-
- There are more pages in this discussion • 41 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PAN (ASX) to my watchlist
|
|||||
Last
3.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $103.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
PAN (ASX) Chart |
Day chart unavailable