LMAO. The concrete used runways and aprons is nearly a metre thick and takes several years to fully cure. No engineer is ever going rip up a slab just to level the base. The will just grind the edges and/or patch. The only time time the slab will be removed is when it needs to be totally replaced. This typically happens after 50+ years.
- Forums
- ASX - By Stock
- EDE
- Ann: Investor Presentation
Ann: Investor Presentation, page-33
-
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EDE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $8.216M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
EDE (ASX) Chart |
Day chart unavailable