“Based on this geophysical data, the Colina SW target area was selected as a priority drilling target. With three drilling rigs focused in this area, four holes have been completed (SADD132, SADD135, SADD137 and SADD145), for a total of 2318.98m, with a further three drill holes in progress (SADD142, SADD046 and SADD150).”
3 drilling rigs at SW Corridor
“One diamond drill rig is currently operating at the Fog’s Block Target, testing the extent of the mineralization associated with a mapped swarm of spodumene pegmatites hosted by biotite schist of the Salinas Formation. To date one hole (MCDD001) has been completed for 455.98 m, with one hole (MCDD002) in progress.”
1 drilling rigs at Fog’s Block (not shown)
“Selective deeper drilling beneath the Colina MRE to investigate the thick and high-grade intersections observed in previous drilling.”
Sentinel shows 3 drilling rigs (S1, S2, S3)
“Commence initial drill testing of the high tenor Li- in – Soil anomaly at the Salinas South Tenement once site preparation has completed.”
One drilling rig? Where is now?...
I overlayed the sentinel images provided (@dawgfather thank you again for all your work! I can keep mapping the sentinel images if helps to the overall picture - just tag me when you post a new image).
There is one rig missing - I see to options here. Or is being taken to the South Salinas to start some work there... or is S4 in the tenement which is available. I hope we find soon about it!
LRS General Discussion, page-11843
Featured News
Add LRS (ASX) to my watchlist
(20min delay)
|
|||||
Last
21.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $588.2M |
Open | High | Low | Value | Volume |
20.5¢ | 21.0¢ | 20.0¢ | $1.912M | 9.315M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 305161 | 20.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
21.0¢ | 2105670 | 16 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 305161 | 0.205 |
6 | 823944 | 0.200 |
7 | 1091099 | 0.195 |
20 | 2956463 | 0.190 |
16 | 3852875 | 0.185 |
Price($) | Vol. | No. |
---|---|---|
0.210 | 1815670 | 15 |
0.215 | 2013727 | 25 |
0.220 | 1748814 | 28 |
0.225 | 2168743 | 11 |
0.230 | 2836496 | 18 |
Last trade - 16.10pm 15/11/2024 (20 minute delay) ? |
Featured News
LRS (ASX) Chart |
The Watchlist
BTH
BIGTINCAN HOLDINGS LIMITED
David Keane, Co-Founder & CEO
David Keane
Co-Founder & CEO
Previous Video
Next Video
SPONSORED BY The Market Online