Try these for “dealbreakers”:
1. The off-grid power solution in Phase 1…and the emergency backup..,followed by;
2. The 300km grid power solution for Phase 2.
These are enormous projects in their own right, susceptible to extensive delays in permitting, design, and construction.
Please note, the latest DFS CAPEX guidelines (US$1.5 billion), excludes item 2. above.
And to think, 12 months ago, the dream team hadn’t even considered power!
Sigh!
IMO DYOR
- Forums
- ASX - By Stock
- LKE
- LKE towards TOP-5
LKE towards TOP-5, page-23442
-
- There are more pages in this discussion • 685 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LKE (ASX) to my watchlist
|
|||||
Last
3.8¢ |
Change
-0.002(5.00%) |
Mkt cap ! $63.40M |
Open | High | Low | Value | Volume |
4.0¢ | 4.1¢ | 3.8¢ | $230.1K | 5.879M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
45 | 4289511 | 3.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.9¢ | 160348 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
44 | 4189511 | 0.038 |
29 | 2802808 | 0.037 |
25 | 1850530 | 0.036 |
30 | 3837186 | 0.035 |
6 | 643852 | 0.034 |
Price($) | Vol. | No. |
---|---|---|
0.039 | 160348 | 3 |
0.040 | 773696 | 12 |
0.041 | 662845 | 7 |
0.042 | 687425 | 8 |
0.043 | 478131 | 4 |
Last trade - 16.10pm 15/07/2024 (20 minute delay) ? |
Featured News
LKE (ASX) Chart |
The Watchlist
RCE
RECCE PHARMACEUTICALS LTD
James Graham / Dr Alan Dunton, MD & CEO / Non-Executive Director
James Graham / Dr Alan Dunton
MD & CEO / Non-Executive Director
SPONSORED BY The Market Online