GT1 0.00% 7.2¢ green technology metals limited

Ann: Root Bay Shaping As Exceptional High Grade Lithium Deposit, page-8

  1. Zkt
    2,079 Posts.
    lightbulb Created with Sketch. 283
    A game changer of confirmation continuation of shallow good length (increasing in excellent width in the furthest drills up to 19.6m RB23-1009 RB23-1013 and RB23-1014). All of the with some of the highest lithium intercepts you will find across potentially 2.7km of it.

    Root project comprises of 12.6 MT 1.21% Li20. This project appearing to become highly economical project and substantially increasing these numbers. Good to note this Root Bay project was never input in early GT1 lithium MT estimate. So this really adds to our long term lithium hydroxide supply potential + support the option of a Eastern and Western Hub plants.
    https://hotcopper.com.au/data/attachments/5426/5426441-c48b50eb87e2a29c14bb3e5864f05924.jpg
 
watchlist Created with Sketch. Add GT1 (ASX) to my watchlist
(20min delay)
Last
7.2¢
Change
0.000(0.00%)
Mkt cap ! $23.48M
Open High Low Value Volume
7.3¢ 7.3¢ 7.2¢ $5.456K 74.96K

Buyers (Bids)

No. Vol. Price($)
2 3168 7.1¢
 

Sellers (Offers)

Price($) Vol. No.
7.2¢ 195230 3
View Market Depth
Last trade - 11.53am 18/07/2024 (20 minute delay) ?
GT1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.