"Having SLB instead of BH to run the wireline to me doesn’t change a whole lot. It all comes down the the crew that is sent to the well site as well as the tools.
Only takes something small to go wrong and having an inexperienced crew and we are done. "
From experience SLB have always had the edge on their competitors in terms of tool development, tool abilities and reliability...and also in terms of the experience levels of their field crews. I've never run a wireline job with SLB where the lead Engineer didn't have the experience necessary to deal with some at times very difficult scenarios. In all my years in the patch I reckon I had one really good Baker crew and one above average Halliburton crew. SLB are usually the most expensive and some of their people can come across as arrogant but in the end they were always my first choice for wireline and MWD/LWD.
- Forums
- ASX - By Stock
- IVZ
- Ann: Mukuyu-2 Appraisal Well Location Selected
Ann: Mukuyu-2 Appraisal Well Location Selected, page-192
-
-
- There are more pages in this discussion • 81 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.4¢ |
Change
-0.004(5.88%) |
Mkt cap ! $98.56M |
Open | High | Low | Value | Volume |
6.5¢ | 6.6¢ | 6.2¢ | $86.26K | 1.341M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 72295 | 6.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.5¢ | 134319 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 72295 | 0.064 |
2 | 71428 | 0.063 |
3 | 505108 | 0.062 |
4 | 720099 | 0.061 |
5 | 735000 | 0.060 |
Price($) | Vol. | No. |
---|---|---|
0.065 | 134319 | 3 |
0.066 | 60623 | 1 |
0.067 | 136665 | 3 |
0.068 | 247728 | 4 |
0.069 | 11700 | 1 |
Last trade - 12.52pm 05/11/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |