yep you may be right about a separate RC drill announcement next week.
They sure do have a lot of cores in the labs which will provide lots of assay announcements in the next month. AZS have only had 4 drills operating for 6 weeks and 6 drills for 2 weeks.
Drill results to date have been almost all based on 2 DD rigs. Assay announcements in the next 3-4 weeks will be from 4 rigs and from about mid-August 6 rigs.
We will be swamped with RC drill results soon especially as RC holes take far less time to drill than diamond holes plus the RC holes are circa half the length of DD holes.
Most of the DD assays are from mineralisation at depth and we have received limited assays from surface to depth of 150m (explorers mostly use DD from deeper drilling). The RC assays will provide a lot more details from surface to a depth of 200m.
- Forums
- ASX - By Stock
- AZS
- Ann: More Very Broad Lithium Intersections Returned at Andover
Ann: More Very Broad Lithium Intersections Returned at Andover, page-161
-
-
- There are more pages in this discussion • 80 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
STX
Strike hands $48.5M contract to Clarke Energy to produce 20x 4.5MW gas engines for Sth Erregulla
MND
Albemarle lithium downsize burns $200M hole in Monadelphous's pocket as latter's contracts terminated