EPM 0.00% 0.7¢ eclipse metals limited.

In Greenland, page-26

  1. 3,401 Posts.
    lightbulb Created with Sketch. 852
    I am still waiting for the gap in the Broker Data to fill. The Exchange Tower building in Perth was inaccessible Monday due to flooding disabling the elevators. So I am thinking it is good reason the data is not available for so long.

    Broker Data: 12/07/2023

    https://hotcopper.com.au/data/attachments/5434/5434912-fe710e22d8e3d0897114a88aa01e74be.jpg


    Broker Data: 13/07/2023

    https://hotcopper.com.au/data/attachments/5434/5434914-e0465306803b6a393dd25ceacc5b5497.jpg

    Left fields Argonauts A/C exiting the trade partially; long terms data shows maybe ~900K share left.


    Year to Date: 01/01/2023 to 13/07/2023

    Note also ~7M sold out from Commsec (which would be pre 01/01/2023 holders).

    https://hotcopper.com.au/data/attachments/5434/5434917-d6ab10d1ed7b1f9d99f7f937465241ce.jpg
    Last edited by Zhc003: 18/07/23
 
watchlist Created with Sketch. Add EPM (ASX) to my watchlist
(20min delay)
Last
0.7¢
Change
0.000(0.00%)
Mkt cap ! $15.75M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 100000 0.7¢
 

Sellers (Offers)

Price($) Vol. No.
0.8¢ 737500 2
View Market Depth
Last trade - 16.12pm 21/06/2024 (20 minute delay) ?
EPM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.